必赢国际

欢迎来到滨州必赢国际电力器材有限公司网站,我们竭诚为您服务

公司新闻
当前位置:首页-资讯中心>公司新闻地埋警示桩施工要求四点注意

地埋警示桩施工要求四点注意

来源:http://www.lnszgh.com/ 发布时间:日期:2022-06-24 0
埋地警示桩可以使用比较长的时间。当然,在使用期间还是需要一定的保养,这样有利于以后的使用,更好的保证在使用过程中能够更好的发挥作用。下面说说埋地警示桩的施工要求:
Buried warning piles can be used for a long time. Of course, some maintenance is required during use, which is conducive to future use and better ensure that it can play a better role in the use process. The construction requirements for buried warning piles are as follows:
一是编制施工组织设计和施工方案,开工前编制施工进度计划。材料设备、成品、半成品等入库方案应报主管审批后移交业主。并在进入现场后,做好单元工程、单元工程、工艺工程的项目划分。
First, prepare the construction organization design and construction scheme, and prepare the construction schedule before commencement. The warehousing scheme for materials and equipment, finished products and semi-finished products shall be submitted to the supervisor for approval and then handed over to the owner. After entering the site, the project division of unit engineering, unit engineering and process engineering shall be completed.
二是开工前清理场地,包括开挖区的垃圾、杂草、不能使用的表土及其障碍物,检查测量控制点和线路位置。开挖边线应有足够数量的埋设警示桩。并注意防止移位和损坏。建设方需要邀请村委会和群众代表参与排线工作。避免不必要的冲突,保证项目的顺利进行。
Second, clean up the site before construction, including garbage, weeds, unusable topsoil and obstacles in the excavation area, and check the locations of survey control points and lines. The excavation sideline shall have enough embedded warning piles. And pay attention to prevent displacement and damage. The construction party needs to invite the village committee and representatives of the masses to participate in the wiring work. Avoid unnecessary conflicts and ensure the smooth progress of the project.
地埋警示桩
三是开挖回填:开挖基础的深度和宽度必须符合设计要求。如有异常现象,应及时报告监理和业主,作出决定后继续施工。回填应按要求回填,否则不予验收。
Third, excavation and backfilling: the depth and width of the excavated foundation must meet the design requirements. In case of any abnormal phenomenon, it shall be reported to the supervisor and the owner in time, and the construction shall continue after making a decision. Backfilling shall be carried out as required, otherwise it will not be accepted.
四是地埋警示桩隐蔽工程必须由监理和现场代表现场核实。接受签证并拍照后,即可进行下一道工序。施工方必须在相应工程竣工后几日内完成并向业主提交工程签证资料。
Fourth, the concealed works of buried warning piles must be verified by the supervisor and the site representative. After receiving the visa and taking photos, the next process can be carried out. The construction party must complete the project within a few days after the completion of the corresponding project and submit the project visa data to the owner.
以上就是问题解答的相关内容了,希望能够帮助到大家,如对这一问题还存在任何疑问,都欢迎关注我们网站http://www.lnszgh.com并咨询我们的工作人员,将竭诚为您服务。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://www.lnszgh.com And consult our staff, will serve you wholeheartedly.

相关产品 / Related products

  • 地钉

    地钉

  • 地钉

    地钉

  • 警示桩

    警示桩

  • 警示桩

    警示桩

截屏,微信识别二维码

必赢国际